The power plant is situated on a 100-hectare land parcel located fifteen
kilometers off the Iranshahr-Chabahar road. The current operational
capacity of the power plant is 415 megawatts, consisting of two V94.2
gas units totaling 315 megawatts and four GE-F5 gas units with a
capacity of 100 megawatts (each with a nominal capacity of 25
megawatts). It is connected through the relevant 230-kilovolt
substation, which includes two input feeders and eight output feeders
towards Iranshahr and Chabahar, facilitating the transmission of
generated energy.

The project is the Chabahar Combined Cycle Gas Power Plant.

The city where the project is Chabahar 

The purchased equipment includes a Steam boiler with equipment